< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

Prop de acero resistente

SHARE:

TECON Heavy Duty Steel Prop es el puntal de acero más robusto y compatible con alta capacidad de carga. Cumplir con los estándares EN1065 en dos series, TEP-D y TEP-E. Tienen el beneficio adicional de requerir menos debido a su alta capacidad de carga.

Feature of Heavy Duty Steel Prop

  • Robust and long service life

  • High bearing capacity following EN 1065 standard

  • Cast steel nut

  • Safe zone prevent hand from harzad Electro galvanization, powder coated and hot-dip galvanization finishing for option



Specification of Heavy Duty Steel Prop

  • Shoring heights: 2.5/3.0/3.5/4.0/4.5/5.0/5.5 m

  • 1.7 times safety factor within work load

  • The work load of TEP-D is 20 kN

  • The work load of TEP-E is 30 kN

  • Outer Dimension: 76.1/ 63.5 mm

  • High tensile steel tube Q355



  • Heavy Duty Prop-D

DescriptionUnitQTY

Unit Price 

USD

Total Price USD

Unit Weight
(KG)
Total Weight
(KG)
Remarks
Heavy Duty Prop TEP-D 25pcs00015.90

Powder Coated;

S355 Inner tube;

Refer to EN1065 norms:

Heavy Duty Prop TEP-D 30pcs000180

Powder Coated;

S355 Inner tube;

Refer to EN1065 norms:

Heavy Duty Prop TEP-D 35pcs00020.220

Powder Coated;

S355 Inner tube;

Refer to EN1065 norms:

Heavy Duty Prop TEP-D 40pcs00023.430

Powder Coated;

S355 Inner tube;

Refer to EN1065 norms:

Heavy Duty Prop TEP-D 45pcs00027.660

Powder Coated;

S355 Inner tube;

Refer to EN1065 norms:

Heavy Duty Prop TEP-D 50pcs00033.060

Powder Coated;

S355 Inner tube;

Refer to EN1065 norms:

Heavy Duty Prop TEP-D 55pcs00038.70

Powder Coated;

S355 Inner tube;

Refer to EN1065 norms:

  • Heavy Duty Prop-E

DescriptionUnitQTY

Unit Price 

USD

Total Price USD

Unit Weight
(KG)
Total Weight
(KG)
Remarks
Heavy Duty Prop TEP-E 25pcs00017.140

Powder Coated;

S355 Inner tube;

Refer to EN1065 norms:

Heavy Duty Prop TEP-E 30pcs00019.350

Powder Coated;

S355 Inner tube;

Refer to EN1065 norms:

Heavy Duty Prop TEP-E 35pcs00021.970

Powder Coated;

S355 Inner tube;

Refer to EN1065 norms:

Heavy Duty Prop TEP-E 40pcs00029.760

Powder Coated;

S355 Inner tube;

Refer to EN1065 norms:

Heavy Duty Prop TEP-E 45pcs00032.350

Powder Coated;

S355 Inner tube;

Refer to EN1065 norms:


Application of Heavy Duty Steel Prop

Applied as shoring support in various slab formwork system with high standard



Últimas noticias
Preguntas frecuentes
  • Q
    ¿Cómo obtener una cotización?

    Puede enviarnos su lista de materiales para solicitar una cotización, o también puede enviarnos simplemente el dibujo estructural y la información del proyecto para una propuesta completa de encofrado y andamios a través de los siguientes contactos.


    Correo electrónico: info@teconform.com

    Teléfono: 86-512-65650586

    Móvil: 86-13862020161.

  • Q
    ¿Cuál es el plazo de pago?

    Por T/T o L/C.

  • Q
    ¿Cuál es el tiempo de entrega?

    Para encofrado de escalada, plataforma de escalada, encofrado de plástico, tenemos stock en nuestro almacén. La preparación de la carga será dentro de 10 a 15 días.


    Para la viga de madera H20, TECON-Form Shuttering, el tiempo de entrega es de 15 a 25 días.


    Para otros sistemas, el tiempo de entrega es de 30 a 45 días.


    Para obtener un plazo de entrega más preciso, no dude en ponerse en contacto con nosotros para obtener un producto específico basado en su cantidad.

Hacer una consulta!
Hacer una consulta!